Skip to content
Join our Newsletter

Designs revealed for new Cambie tower with tiered terraces

The designs for one of the tallest phases of the Pearson Dogwood redevelopment on Cambie Street have been revealed by developer Onni Group and architectural firm IBI Group.
Pearson Dogwood Parcel C tower IBI Onni main
This 27-storey tower plus podium buildings with tiered terraces is proposed as part of the Pearson Dogwood redevelopment on Cambie Street. Image: Onni/IBI Group via City of Vancouver planning

The designs for one of the tallest phases of the Pearson Dogwood redevelopment on Cambie Street have been revealed by developer Onni Group and architectural firm IBI Group.

The development team is planning a 27-storey tower with multi-level podiums and roof terraces for Parcel C of the 25.4-acre site, which runs between West 54th and West 57th Avenues on Cambie Street.

The new development, at 698 West 57th Avenue, will contain 171 market condos and six one-bedroom supportive housing units, which serve as part of the replacement housing for the George Pearson Centre. The breakdown of the 171 market residential units is 65 one-bedroom units, one one-bedroom-plus-flex unit, 44 two-bedroom units, 55 two-plus-flex units and six three-bedroom units.

The development would also contain 17,545 square feet retail on level 1, a 96,000 square-foot community health on levels 1-4, a swimming pool on level 3 and a daycare on level 4. There will be four levels of underground parking, which will be “accessed from a new internal street,” according to the development application.

Pearson Dogwood Parcel C tower IBI Onni tower view
This 27-storey tower will have 171 market residential units and enjoy panoramic views to the south, as shown in this rendering. Image: Onni/IBI Group via City of Vancouver planning

The retail space, as well as a clock tower, will face Pearson Plaza, which will be a central plaza with a park and gathering spaces serving the new community.

Pearson Dogwood Parcel C tower IBI Onni internal street
Four levels of underground parking will be accessed via an "internal street," according to the development application. Image: Onni/IBI Group via City of Vancouver planning

IBI wrote in its design rationale, “The project uses simple, repetitive, two-dimensional and three-dimensional patterns to create organic architectural responses to the conditions of the large site.”

Pearson Dogwood Parcel C tower IBI Onni roof terrace
One of many roof terraces in the proposed design, this one is outside of the daycare facility on level 4. Image: Onni/IBI Group via City of Vancouver planning

The application will go before the Development Permit Board for a decision on Monday May 28, 2018. Those wishing to attend may do so, and may address the board upon request – details on the City of Vancouver’s website here. Those unable to attend may write to or email the board at any time until the decision.